Measured proof that your data centre air, surfaces and water are within spec.

Colo Enviro Labs tests particle cleanliness, gaseous corrosion, indoor air quality, water and thermal performance for data centres, cleanrooms and critical facilities. You get readings you can defend in an audit, a customer review or a warranty claim.

Lab at Goodwill Bizhub, MIDC Pawne, next to IKEA Turbhe, Navi Mumbai

  • Test familiesParticles, corrosion, IAQ, water, thermal
  • 14Standards on our reportsISO, ISA, ASHRAE, ISHRAE, BIS, ASTM, NFPA
  • 1working dayTo replyWith a sampling plan and fixed quote
  • Pan‑IndiaField coverageMumbai, Navi Mumbai, Thane, Pune, Chennai, Hyderabad, Vizag, Noida, Greater Noida, NCR, Ahmedabad, Indore, Jaipur

What we test

Tests built around how data centres actually fail

Contamination damage builds slowly. Zinc whiskers, sulfide films on silver, dust that turns conductive at high humidity and scale in cooling towers rarely raise an alarm until hardware fails. Each service below targets one of those failure routes.

Why it matters in Mumbai and Navi Mumbai

Local air is harder on electronics than most design briefs assume

Navi Mumbai's data centre belt sits beside the Thane-Belapur and Taloja industrial areas, the Thane creek and the Arabian Sea. That puts three things into the air your fresh-air units pull in: sulfur compounds from industry and diesel traffic, chlorides carried on sea air, and fine dust from construction that never seems to stop.

Since the move to lead-free (RoHS) boards, silver and copper on circuit boards react with sulfur to form creep corrosion that can short components. The monsoon then lifts indoor humidity, and dust that was harmless at 40% RH starts to absorb moisture and conduct.

None of this shows up on a BMS screen. It shows up as unexplained hardware failures 18 months later. Periodic testing is how you see it early and fix the filtration, pressurisation or cleaning schedule before it costs you a server.

Where our field teams test

  • Mahape
  • Airoli
  • Rabale
  • Ghansoli
  • Juinagar
  • Turbhe
  • Taloja
  • Mumbai
  • Thane
  • Pune
  • Chennai
  • Hyderabad
  • Vizag
  • Noida
  • Greater Noida
  • NCR
  • Ahmedabad
  • Indore
  • Jaipur
  • Pan-India for projects
RiskWhat we measureTypical fix
Sulfide and chloride filmsCu and Ag coupon film thicknessChemical filtration, sealing intakes
Conductive or hygroscopic dustParticle counts, gravimetric dustFilter upgrade, deep cleaning
Dust entering from corridorsRoom differential pressurePositive pressure, door seals
Hot spots and recirculationRack inlet temperature at 3 heightsBlanking panels, tile layout
Scale, corrosion, LegionellaWater chemistry and cultureDosing correction, disinfection

How an engagement runs

From your first call to a report your auditor accepts

  1. Scope

    You share drawings, room areas and the limits in your SLA or design basis. We confirm the standard and occupancy state.

  2. Sampling plan

    We fix the number and position of test points, sample volumes and timings, and send a method statement for your permit.

  3. Site work

    Calibrated instruments, logged on site with location IDs. Water and coupon samples are sealed and kept under chain of custody.

  4. Lab analysis

    Samples are analysed at our Navi Mumbai lab. Field data is checked against instrument calibration and blanks.

  5. Report & review

    Raw data, floor plan with points, pass or fail per location, likely causes and corrective actions. We walk your team through it.

Step 1 starts here

Send the scope, get back a sampling plan and a fixed quote

A few lines about the site is enough to start. The reply is the plan itself, so you can weigh it against any other lab’s.

Prefer to talk? Call +91 96395 35455 or message us on WhatsApp.

Standards we test against

Your limit, your standard, stated on every report

We do not invent pass marks. Each report names the clause and edition used, so results can be compared year on year.

ISO 14644-1:2015ISO 14644-2:2015ANSI/ISA-71.04-2013ASTM B825ASHRAE TC 9.9 thermal guidelinesASHRAE particulate & gaseous guidelineASHRAE 62.1ISHRAE 10001:2019IS 10500:2012ISO 11731 (Legionella)ASHRAE 188ISO 4406 fluid cleanlinessNFPA 70BMPCB consent norms

Why teams trust the numbers

Reports an auditor can trace, line by line

No marketing-grade “all clear”. Every figure on a CEL report ties back to an instrument, a method and a limit you chose.

ISO/IEC 17025

Quality system, NABL in progress

Built to ISO/IEC 17025, with NABL accreditation under way. Until the scope is granted we say so plainly and our reports carry no NABL mark.

TRACEABLE

Calibrated, traceable instruments

Each instrument’s serial number and calibration due date is printed on your report, traceable to national standards. Past-due instruments are tagged out of service.

RAW DATA

Raw readings, not just a verdict

Every report gives raw readings, sample locations, the method, the clause and the measurement uncertainty — so your team or auditor can re-check each number.

INDEPENDENT

Independent of the cleaning crew

Testing is most useful when it is not done by whoever cleaned or built the space. We report raw counts and locations even when the site was cleaned by our group company.

CHAIN OF CUSTODY

Chain of custody & field blanks

Coupons and water samples carry a chain of custody from site to bench, with field blanks and duplicates on each batch.

SAMPLE REPORT

See a sample report first

Want to see the format before you commit? Ask for a redacted sample report for your test type.

Request a sample report →

Questions we get asked

Frequently asked questions

What does an environmental testing lab do for a data centre?
We measure the things that quietly shorten hardware life or fail an audit: airborne particles against ISO 14644-1, corrosive gases using copper and silver coupons against ANSI/ISA-71.04, rack inlet temperature and humidity against the ASHRAE envelope, room pressure and tile airflow, indoor air quality in occupied areas, and the water in cooling towers, chilled water loops and potable lines. Each test ends in a report with raw readings, locations and pass or fail against the limit you specified.
Is Colo Enviro Labs NABL accredited?
Our quality system is built to ISO/IEC 17025 and we are working through NABL accreditation. Until the NABL scope is granted, our reports do not carry the NABL mark. Every report still states the test method, instrument serial number, calibration certificate reference and measurement uncertainty, so your auditor can trace each number.
Can you test a live data hall without disrupting operations?
Yes. Particle counters, thermo-hygrometers, anemometers and thermal cameras are battery powered and non-contact. Our technicians work under your permit-to-work and method statement, follow ESD and hot-aisle safety rules, and never open, touch or move IT equipment. Most data hall surveys are completed in one shift.
How long does it take to get results?
Typical turnaround: particle count surveys, report within 2 working days of the site visit. Thermal surveys, within 5 working days. Electrical cable testing, 3 weeks. Corrosion coupons, 30 days of exposure plus about 7 working days of analysis. Water and cooling tower chemistry, 2 to 3 working days. Legionella culture, 10 to 14 days, because the ISO 11731 method needs up to 10 days of incubation.
Which locations do you serve?
Our lab is in Navi Mumbai, a short drive from the data centre campuses in Mahape, Airoli, Rabale, Ghansoli, Juinagar, Turbhe and Taloja. We send field teams across Mumbai, Thane, Pune, Chennai, Hyderabad, Vizag, Noida, Greater Noida, NCR, Ahmedabad, Indore and Jaipur, and travel pan-India for project work and commissioning.
Who should own environmental testing: the operator, the contractor or a third party?
The operator should own the schedule and the limits. Testing works best when it is done by someone independent of the person who cleaned or built the space. CEL is a group company of Colo Techxpert Solutions, which provides specialist data centre cleaning. When we test a site CTS has cleaned, our report shows raw counts, sample locations and instrument IDs, so your team or auditor can check the numbers themselves.

Talk to the lab

Rather talk it through? Call, WhatsApp or drop in.

Share site photos or drawings on WhatsApp, or bring samples to the lab next to IKEA Turbhe, Monday to Saturday.

Call the lab+91 96395 35455Mon–Sat, 10 am – 6 pm
WhatsAppChat with the labSend site photos or drawings here
EmailTest@coloenvirolabs.co.inReply within one working day
LabGoodwill Bizhub, MIDC PawneNext to IKEA Turbhe, Navi Mumbai 400703